<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1709386795989976&amp;ev=PageView&amp;noscript=1">

Case Studies

GE Healthcare Cuts MRI Cycle Times By 55%, Halving Labor Needed With Fully Automated System

Choosing The Original Equipment Manufacturer (OEM)

After extensive proposal reviews, GE Healthcare chose Praxair USA as the vendor. Initially they were hesitant because Praxair insisted on LJ Welding Automation as the OEM and is based..

Continue Reading

Robotic Welding For Full Root, Fill & Cap Welding Of Pressure Pipe

 

The Situation

A major energy company with pipe fabrication facilities located in a remote area of Alberta, Canada, approached LJ for a..

Thin-Walled Tank Manufacturer Automates: Doubles Output With Fit-Up Bed Manipulator Robotic Welding Cell

Situation

A North American manufacturer of thin walled oil storage tanks was using antiquated, inefficient equipment that led to production..