<img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=1709386795989976&amp;ev=PageView&amp;noscript=1">

Case Studies

Thin-Walled Tank Manufacturer Automates: Doubles Output With Fit-Up Bed Manipulator Robotic Welding Cell

Situation

A North American manufacturer of thin walled oil storage tanks was using antiquated, inefficient equipment that led to production delays and in turn, a loss of market share in a hyper-competitive market. This company needed not only..

Continue Reading

How Does A Growing Line System For Vessel or Wind Tower Fabrication Work?

 Introducing the LJ Growing Line System

LJ has recently introduced a new and superior system for handling cumbersome fit up of long heavy..

Spooling Facility Reduces Fit Up Time From Hours To Minutes Using Headstock Positioner & Turning Rolls

Situation

A pipe spool fabrication facility located in Ontario, Canada needed to alleviate the bottleneck of time consuming..