Spooling Facility Reduces Fit Up Time From Hours To Minutes Using Headstock Positioner & Turning Rolls
Situation
A pipe spool fabrication facility located in Ontario, Canada needed to alleviate the bottleneck of time consuming pipe/flange/elbow fit-up with a range of 2" through 60" diameter. Fit-up cycle times were taking several hours on average..
Continue Reading